Project Overview & Highlights

Widelity is supporting MinTIC in closing coverage gaps and expanding connectivity in La Guajira through tailored network strategies and regulatory guidance.

Project:

MinTIC

Location:

Colombia

Services:

Network Strategy

Accomplishments:

  • Engagement launched in 2023
  • Regulatory guidance delivered
  • Coverage solutions designed
  • Compliance with local regulatory

Project Details

MinTIC needed support overcoming regulatory and geographic challenges to expand coverage in La Guajira. Widelity provided network strategy expertise and worked with stakeholders to design practical, sustainable solutions that advance Colombia’s national connectivity goals.

Project Details

The Challenges

Colombia faced persistent connectivity gaps in remote regions, with La Guajira presenting both regulatory hurdles and difficult terrain. MinTIC needed a partner to navigate these complexities while planning sustainable expansion.

The Solutions

We believe progress is measured not only by the strength of our networks but by the strength of the communities we serve. Our Citizenship initiatives focus on advancing digital inclusion, supporting education, and fostering sustainable growth.

The Results

increase in planned coverage area for underserved communities in La Guajira.

regulatory hurdles addressed through strategic guidance and stakeholder collaboration.

residents positioned to gain improved access to reliable communications.

Mariana López

Director of Infrastructure Planning, MinTIC

Ami Ripka
Ami Ripka
Vice President of Programs

Ami Ripka

Education: Lorem ipsum dolor sit amet

Location: Lorem ipsum dolor sit amet

Practice Areas: Lorem ipsum dolor sit amet

Enjoys: Lorem ipsum dolor sit amet

Lorem ipsum dolor sit amet

Lorem ipsum dolor sit amet

Trust Widelity for Impact & Results

Scroll to Top